Construction Photo p000205.jpg

9/28/98 A view from above, looking north, shows the roof beams in place. The near (south) wall has almost all of the siding installed, and a portion of the white "Tyvek" plastic house wrap can be seen at the left. This is installed on all the exterior walls before the wood siding.

Construction Photo p000206.jpg

9/28/98 The northwest corner from inside, showing framing for the three windows that will be installed on each side of the corner.

Construction Photo p000207.jpg

9/28/98 A view of the north wall from inside, showing the white plastic installed outside the frame and under the exterior siding. Note the two diagonal braces with screw-adjustable ends that serve to keep the top of the frame in exact alignment so that all the notched rafters will fit correctly when they are installed on top.

Construction Photo p000209.jpg

9/28/98 An outside view of the northwest corner, showing the siding and windows in place on the north wall.

Construction Photo p000210.jpg

9/28/98 The south wall, with the near door and three windows serving the bathroom, and the far door giving external access to the space for the water heater and radiant floor equipment. The beam in the foreground will support a 6 foot roof overhang.

11/24/98 The shower is being installed. The light bulb is providing warmth to cure the adhesive where the shower wall has been cut for a window and the remaining rim glued to the wall for rigidity. Note the skylight directly above the shower

11/24/98 A view of the "front" of the bedroom, looking northwest out of the windows. The walls have been insulated, and the first of the ceiling sheetrock has been installed. One of the two bedroom skylights can be seen here.

12/9/98 This inside view of the front of the bedroom shows that the sheetrock has been taped and textured. One more smoothing operation, and it will be ready for paint.