9/22/98 A pair of custom made supports will
be fastened to the outside of the wall and will hold up the
four foot roof overhang at the back (east) side of the
building.
9/22/98 The diagonal brace is inlet into the top horizontal
piece and bolted so that it does not move under stress.
9/22/98 At this point all of the external walls are framed,
and some of the beams that will support the front porch
roof can be seen on the left (west) side of the picture.
The bathroom will occupy part of the the near (south)
side of the building,
and the internal wall that will separate bath from bedroom
can be seen in this picture.